Biodata of Alumni Regional Engg College, Kurukshetra in 1965
Name : Sudershan Kumar Sekhri
Roll No. : 100
Branch : Mechanical
Higher Education, if any and membershio of Professional Bodies : NA
Address : D-5/ 602, Ashok Nagar, Off Military Road,Marol, Andheri (East), Mumbai-400072
Date of Birth : 17-01-1948
What career did you followed : Professional Engineer for Power Projects
Office/Business Address : Present Office Address - GEI Power Ltd Mumbai 400098
If retired than mention last Designation, Organization and the Date of Superannuation : Retired as Project Manager with M/S Development Consultants Pvt. Ltd.Navi Mumbai (DCPL) on 16.01.2006
What are you doing now : As Consultant with GEI Power Ltd ,Mumbai
 
Family Particulars
Date of Marriage : 05-02-1976
Name of Wife : Kanchan Sekhri
Date of birth of wife : 17-07-1951
No of Children and their Educational/Marital/settlement status
Sons :

One: Amit Kumar Sekhri (Married in May’09 & staying with me)

Daughters : One: Dipti Seth (Married & settled in New York)
No of grand children if any : Three
Phone No. : Mobile: 98194 70852 Landline:
022 - 29203528
Email ID if any : sksekhri@yahoo.com
Any other Information/ Remarks : NA
 
Last Updated: 09 Feb 2009
Sudershan Sekhri

Professional Qualifications
Mr. Sudershan K. Sekhri has more than 38 years of experience in Engineering and Project Management of Nuclear, Coal, Oil & Gas based Power Projects .These Projects were either grass root installations or revamp of existing Plants. Some of the Major Projects include Reliance Energy's 2X250 MW Coal based Thermal Power Plant at Dahanu(Maharashtra),Siemens’ Gas Turbine based Combined Cycle Power Plant & Desalination Plant (740 MW/50 MGD)at Al Tawillah near Dubai, Reliance Industries Ltd.'s Gas Turbine based CCPP at Naroda(50MW)and Cogeneration Power Project at Patalganga(30MW),GNFC's Furnace Oil based 2X25 MW Captive Power Project at Bharuch(Gujarat) and Nuclear Power Corporation's Projects at NAPP-PhaseI,kudankulam's Infrastructure Project(1000MW)& Heavy Water Project at Kota.

 
Job responsibilities in various projects involved the following activities:
(i) Basic design, Conceptual design, Feasibility studies, P&I Diagrams, DBR’s (Design Basis Reports), Project Reports, etc.
(ii) Detailed engineering of Nuclear Power Projects, coal& Furnace Oil based power projects as well as gas based combined cycle power projects covering gas turbines, HRSG’s , steam turbines, Boilers, and various Auxiliary Plants such as CHP, OHP, AHP, Air, Fire Protection, DMW, CT, ETP, etc as well as secondary cycle systems of Nuclear Power Projects.
(iii) Detailed piping design of various interconnected systems such as HP & LP steam piping, Feed water, Fuel gas, Fuel Oil, CW/ACW, DW,IA,SA etc., including Hangers & Supports and pipe rack / Building supporting Structures etc.
(iv) Procurement activities such as preparation of Tender specs., EPC bid documents, Cost estimation, Tender Evaluation and procurement assistance etc. for various Power Plant Packages and Thermal & combined cycle power plants, IPP’s (Independent Power Projects) and EPC projects.
(v) Review of Vendor’s drawings and documents.
(vi) Project coordination, monitoring, scheduling, site coordination and follow up etc.
 
Education
Bachelor of Science, Mechanical Engineering, Kurukshetra University (Regional Engg. College), Kurukshetra (Near Delhi) Haryana, India, 1970
 
 Experience and Background
 

04/2006 – Present
Senior Project Manager, Shaw Rolta Limited( Formerly Stone & Webster Rolta Limited), Power Projects, Mumbai, Maharashtra, India

 
(i) Senior Project Manager in Mumbai office for 2x110 MW GT based Cogeneration Power plant consisting of 2nos.GE's Frame 9E Machines 2nos.HRSG's (with provision of supplementary fuel firing),2nos. Auxiliary Boilers, Boiler Feed Water System, Circulating Water System, Steam Let Down Stations,50 MW Steam Turbine Drive for Process Gas Compressor, Various small Steam Turbine Drives(1to30 MW) etc. of Exxon Mobil's 944 KTA Ethylene Project at Singapore.
(ii) Techno-Commercial proposals for REL's 5600 MW GT based CCPP at Dadri & 1400 MW coal based supercritical power plant at Shahpur.
(iii) Techno-Commercial proposal for RIL's 2000 MW GT based power plant + 2.0 Million TR Chilling Plant.
(iv) Techno-Commercial proposal for DLF's 5x5 MW GT based power plant + 18,000 TR Chilling Plant.
(v) As Senior Project Manager in Mumbai office for SSW’s LHC- China ,450 KTA Ethylene capacity increasing project.
 

09/1974 - 03/2006
PM, GM, Dy.C.E. etc, Development Consultant Pvt. Ltd.( The Kuljian Corporation of USA ), Power Projects, Mumbai, Maharashtra, India

 
(i) April, 2005 to March 2006(DCPL) : Project Manager for 4X23 MW CPP at Gujarat Cement Works of Grasim Industries at Amreli in Gujarat ( Lignite fired CFBC Boilers ).
(ii) 2004 to April 2005(DCPL) : Project Manager for RNPL's 23 MW CPP and REL's STG Plant at their Goa Power Station (69 MW CCPP) and prepared Project Report for Sterlite's coal based 2400 MW TPP at Jharsuguda in Orissa.
(iii) 2002-2003 (DCPL) : Project Manager for BALCO's 4 X 67.5MW CPP-water supply & Treatment plants and detailed engineering of 2x55 MWe CPP for Ispat Energy Ltd.
(iv) 2001 - 2002 (DCL) : Project Manager for Review Services of NPC's Kudankulam Project - RO Plant and HVAC for Infrastructure works of 1 x 1000 MW Atomic Power Project. Also worked as Project Manager for HP Steam piping job for RCF Thal and bagasse based 45 MW IPP of Globe Cogeneration Power Plant (EPC basis).
(v) 1999 - 2001 (DCL) : Project Manager for Siemens portion of fast track EPC job involving piping for Combined cycle power plant of 740 MW & 50 MGD desalination plant consisting of Siemens 3 nos. Gas Turbines V-94.3 A (170 MW each) & 2 Nos Back Pressure steam Turbines (114 MW each) and Hanzung's HRSG's & Desalination plant etc.
(vi) 1997 - 1999 (DCL) : Project Manager for following projects:
(a) 5 x 120 MW CPP - Sterlite Industries -EPC Bid Documents for coal based power plant
(b) 55 MW CCPP - Adani Exports, Anjar - IPP Bid documents for CCPP
(c) 60 MW CCPP - L&T - S&L - Kovaya, Gujarat - Review Services.
(d) 20 MW CPP - NPIL, Nagpur - EPC Bid documents.
(vii)

1996 - 1997 (DCL): Project Manager for following jobs:
(a) 30 MW Gas Turbine based Co-gen. Power Plant of Reliance Patalganga (Ph-II) - Detailed Engineering (Concept to Commissioning).
(b) 50 MW CCPP - GNFC - FR (Feasibility Report) and Detailed Engineering.
(c) 50 MW CCPP - RCF Trombay - FR (Feasibility Report).

(viii) January 1995 to Sept. 1995: As General Manager for FINOLEX's IPP's (FINOLEX, PUNE) - 500 MW CCPP in Kerala and 340 MW CCPP in Ratnagiri. Black & Veatch (U.S.A) were owner's consultants for these proposed combined cycle power plants.
(ix) 1993 - 1994 (DCL): Project Coordinator (Dy. C.E.) for 50 MW CCPP - RIL Naroda - Detailed Engineering (Concept to Commissioning).
(x) 1988 - 1993 (DCL): Project Coordinator (Dy. CE) for 2 x 250 MW TPS - BSES, Dahanu (Coal based Power Plant) and engineering activities for AL Jabaleli combined cycle power plant at Dubai .
(xi) 1984 - 1988 (DCL): Lead Engineer (Astt. CE) - 2 x 25 MW CPP- GNFC, Bharuch (PH-I + II) - Detailed Engg. (Concept to Commissioning)
(xii) 1980 - 1984 (DCL) : Sr. Project Engineer - 2 x 15 MW CPP - RCF Thal - Detailed engineering (Coal based Captive Power Plant)
(xiii) 1978 - 1980 (DCL) : Project Engineer - 2 x 235 MW -Nuclear Power Project NAPP - Detailed Engineering.
(xiv) 1974 - 1978 (DCL) : Senior Design Engineer - Heavy Water Project, Kota - Detailed Engineering.
 

07-1970 to 09-1974
Mechanical Engineer, Sales Engineer, ICB, APV, Esso Refinery, Mechanical, Mumbai, Maharashtra, India

 
(i) ICB, Mumbai - Namrup Project as Mechanical Engineer.
(ii)

APV, Thane - Sales Engineer for Chemical Process Equipments.

(iii) ESSO Refinery (HPCL), Trombay as Designer for Tanks, Vessels & Piping etc.
 
While as student
Now
     
Regional Engg. College Kurukshetra 1965.
Data furnished By Sh Jai N. Mehra. Amended by P. P. Kakkar on 06/08/2022